Project Overview

The project scope included:

  • Four new 960 square foot modular classroom buildings, 2 new student gang restrooms and electrical and custodial rooms.
  • Complete reconfiguration of the exterior courtyard with new sitework, trees, picnic tables, seat walls and grass.
  • Site lighting was added along with security cameras. A complete new storm drain system was added to alleviate the flooding problems.

The existing portables at Sierra Oaks were old, dilapidated buildings that were falling apart and had that old musty smell when you walked in the room. Teachers, staff and students can now breathe deeply and enjoy the new 4 classroom wing along with all new student restrooms. The old buildings have been demolished and the new buildings have been put in their place. Each classroom is 960 SF with carpet, vinyl covered tackboard, energy efficient lighting, casework and sinks. The new restrooms are now ADA compliant, have epoxy floors, ceramic tile walls and water saving plumbing fixtures. The exterior courtyard received a full make over with new sidewalks, seatwalls, picnic tables, trees and grass. Light poles and cameras were added for illumination and security.

Owner
Cathy Allen
San Juan Unified School District
Sr. Director of Facilities
(916) 971-5796
Fair Oaks, CA   95628
USA
Architect
Michael Goldsworthy
ATI
Phone: (916) 772-1800
Project Inspector
Bob Benson
(916) 997-2205