Cottage Elementary School - Paving

Paving

Cottage Elementary School - Restroom Upgrade - Before Project
Close Me!

Paving
Before Project

  • Cottage Elementary School - Restroom Upgrade - Before Project

    Paving
    Before Project

  • Cottage Elementary School - Restroom Upgrade - During Project

    Paving
    During Project

  • Cottage Elementary School - Restroom Upgrade - During Project

    Paving
    During Project

  • Cottage Elementary School - Restroom Upgrade - After Project

    Paving
    After Project

Project Overview

The project scope included:

  • Reconstruction of the existing parking lot with new loading zone, fire lane and ADA parking stalls
  • New ADA compliant sidewalks, energy efficient LED lighting, replacement of water and storm drainage systems
  • New landscaping with an upgraded irrigation system

Since the schools' construction in the 1950's, Cottage Elementary School has received minimal site improvements. The old parking lot and sidewalks were not ADA compliant and full of cracks and potholes. Cottage Elementary School received a full make over compromising of new ADA compliant walks, hot mix asphalt parking lot, landscape and irrigation along with new water and storm drainage infrastructure.

Owner
Cathy Allen
San Juan Unified School District
Sr. Director of Facilities
(916) 971-5796
Fair Oaks, CA   95628
USA
Architect
Kirk Brainerd
Kirk Brainerd Architects
Phone: (530) 295-9371
Sacramento, CA  95811
USA
Project Inspector
Don Dumford
(916) 454-4920