Arlington Heights Elementary School

Paving Project

Before Project
Close Me!

Before Project

  • Before Project

    Before Project

  • During Project

    During Project

  • Project Completion

    Project Completion

Project Overview

The project scope included:

  • A new sidewalk was added with compliant loading zones for safety of the students.
  • The existing hard court and the entire front parking lot was sealed and striped for added curb appeal and parking lot function.
  • The site wide irrigation system was upgraded to fully automatic.

Arlington Heights ES received a much needed, substantial face lift. The majority of the work was in the front of the school with a new concrete plaza/waiting area, new landscaping, and the site surrounded by wrought iron fencing for security.

Owner
Kent Kern
San Juan Unified School District
Sr. Director of Facilities
(916) 971-5796
Fair Oaks, CA   95628
USA
Civil Engineer
Tom Fassbender
Warren Consulting Engineers, Inc.
Phone: (916) 985-1870
Folsom, CA  95630
USA
IOR
Don Dumford Independent Inspections, Inc.
(916) 454-4920
Sacramento, CA  95819
USA