Arlington Heights Elementary School
Paving Project
Project Overview
The project scope included:
- A new sidewalk was added with compliant loading zones for safety of the students.
- The existing hard court and the entire front parking lot was sealed and striped for added curb appeal and parking lot function.
- The site wide irrigation system was upgraded to fully automatic.
Arlington Heights ES received a much needed, substantial face lift. The majority of the work was in the front of the school with a new concrete plaza/waiting area, new landscaping, and the site surrounded by wrought iron fencing for security. |
Owner
Kent Kern
San Juan Unified School District
Sr. Director of Facilities
(916) 971-5796
|
Civil Engineer
Tom Fassbender
Warren Consulting Engineers, Inc.
Phone: (916) 985-1870
|
IOR
Don Dumford Independent Inspections, Inc.
(916) 454-4920
|
|