Project Details
The list below represents projects that ICS has completed and/or are currently in construction/closeout.
| Year | Site | Project Type | Contractor | Original Contract Value | Change Order Total | Revised Contract Value | Change Order Percentage |
|---|---|---|---|---|---|---|---|
| TOTALS: | $56,464,061.19 | $1,860,930.26 | $58,324,991.45 | 3.3% | |||
| 2002 | Cameron Ranch ES | Portable Rehab | Hutcheson | $247,680.00 | $5,195.00 | $252,875.00 | 2% |
| 2002 | Coyle Avenue ES | Portable Rehab | Star Construction | $144,500.00 | $4,204.00 | $148,704.00 | 3% |
| 2002 | Salk MS | Portable Rehab | Hutcheson | $399,980.00 | $32,472.53 | $432,452.53 | 8% |
| 2002 | Will Rogers MS | Portable Rehab | Dual Cal Builders | $119,752.19 | $8,165.50 | $127,917.69 | 7% |
| 2002 | Andrew Carnegie MS | Portable Rehab | Dual Cal Builders | $342,000.00 | $12,418.12 | $354,418.12 | 4% |
| 2002 | Green Oaks ES | Portable Rehab | Hutcheson | $649,650.00 | $53,096.39 | $702,746.39 | 8% |
| 2003 | Ralph Richardson | Portable Rehab | Dual Cal Builders | $547,800.00 | $36,688.21 | $584,488.21 | 7% |
| 2003 | Northridge ES | Portable Rehab | BoBo Construction | $1,240,000.00 | $64,872.50 | $1,304,872.50 | 5% |
| 2003 | Lichen I ES | Portable Rehab | BoBo Construction | $890,000.00 | $59,611.00 | $949,611.00 | 7% |
| 2003 | Mariposa ES | Portable Rehab | Landmark | $750,000.00 | $21,718.00 | $771,718.00 | 3% |
| 2003 | Salk Landscaping | Landscape & Irrigation | Navarette Land | $156,750.00 | $7,598.00 | $164,348.00 | 5% |
| 2003 | Dyer-Kelly ES | Portable Rehab | BoBo Construction | $475,000.00 | $17,597.00 | $492,597.00 | 4% |
| 2003 | Gold River ES | Portable Rehab | Dual Cal Builders | $306,172.00 | $16,784.32 | $322,956.32 | 5% |
| 2003 | La Vista Portable | Portable Rehab | Spanda Industrial | $199,916.00 | $10,536.40 | $210,452.40 | 5% |
| 2003 | Trailer Removal 5 sites | Portable Rehab | SLS Construction | $118,000.00 | $7,505.00 | $125,505.00 | 6% |
| 2003-2004 | Lichen II ES | Portable Rehab | Peterson Developments | $1,835,600.00 | $91,119.53 | $1,926,719.53 | 5% |
| 2003 | Mesa Verde | Restroom Repair / Emergency project | Landmark | $200,000.00 | $(88,351.00) | $111,649.00 | -44% |
| 2003 | Charles Peck Charter School | Portable Rehab | BoBo Construction | $350,000.00 | $(175,447.00) | $174,553.00 | -50% |
| 2003-2004 | San Juan HS | Portable Rehab | BoBo Construction | $1,130,000.00 | $142,582.45 | $1,272,582.45 | 13% |
| 2003-2004 | Grand Oaks ES | Portable Rehab | BoBo Construction | $500,000.00 | $21,505.00 | $521,505.00 | 4% |
| 2004 | SC 2004 - Bid Pkg One | Portable Rehab | Peterson Developments | $1,516,500.00 | $99,834.00 | $1,616,334.00 | 7% |
| 2004 | SC 2004 - Bid Pkg Two | Portable Relocation | Spanda Industrial | $1,119,950.00 | $33,813.40 | $1,153,763.40 | 3% |
| 2004 | Woodside ES | Paving | Dual Cal Builders | $769,494.00 | $23,057.70 | $792,551.70 | 3% |
| 2004-2005 | Woodside ES | Portable Rehab | Landmark | $1,679,000.00 | $71,298.00 | $1,750,298.00 | 4% |
| 2005 | La Entrada Portable Rehab | Portable Rehab | LM Combs Construction | $197,400.00 | $5,568.00 | $202,968.00 | 3% |
| 2005 | Trailer Removal Summer 2005 | Portable Rehab | LM Combs Construction | $96,700.00 | $9,138.00 | $105,838.00 | 9% |
| 2005 | Thomas Kelly | Portable Rehab | Peterson Developments | $1,445,150.00 | $90,937.00 | $1,536,087.00 | 6% |
| 2005 | Cambridge Heights ES | Paving | Biondi Paving | $204,220.00 | $(600.00) | $203,620.00 | 0% |
| 2005 | El Camino HS | Paving | James Riolo Paving | $1,800,000.00 | $247,590.00 | $2,047,590.00 | 14% |
| 2005 | Mariposa ES | Paving | Martin Brothers Construction | $347,000.00 | $67,283.21 | $414,283.21 | 19% |
| 2005 | Mira Loma ES | Paving | Biondi Paving | $1,256,860.00 | $41,038.00 | $1,297,898.00 | 3% |
| 2005 | Ralph Richardson | Paving | American Engineering | $387,650.00 | $714.00 | $388,364.00 | 0% |
| 2005 | Skycrest ES | Paving | American Engineering | $159,500.00 | $(15,791.00) | $143,709.00 | -10% |
| 2006 | Bella Vista | Paving | Central Valley | $756,609.00 | $(46,786.00) | $709,823.00 | -6% |
| 2006 | San Juan HS | Paving / Infrastructure | JRS | $281,356.00 | $13,141.00 | $294,497.00 | 5% |
| 2006 | Skycrest | Portable Rehab | Peterson Developments | $1,703,666.00 | $31,802.00 | $1,735,468.00 | 2% |
| 2006 | Lichen K-8 | Portable Rehab | SLS Construction | $50,000.00 | $2,758.00 | $52,758.00 | 6% |
| 2006 | Bella Vista HS | Portable Rehab | SLS Construction | $187,000.00 | $9,008.00 | $196,008.00 | 5% |
| 2006 | Oakview ES | Portable Rehab / Fire Sprinklers | SLS Construction | $246,000.00 | $5,890.00 | $251,890.00 | 2% |
| 2006 | Thomas Kelly | Paving (DM) | Biondi Paving | $68,000.00 | $- | $68,000.00 | 0% |
| 2006 | Will Rogers | Paving (DM) | Broward Brothers | $154,140.00 | $(12,825.00) | $141,315.00 | -8% |
| 2006 | Seal & Stripe | Paving | J&S Asphalt | $22,524.00 | $900.00 | $23,424.00 | 4% |
| 2006 | Sunrise Inc. I | Paving | CPM | $48,062.00 | $- | $48,062.00 | 0% |
| 2006 | Sunrise Inc. II | Paving | James Riolo Paving | $112,000.00 | $1,153.00 | $113,153.00 | 1% |
| 2006 | Casa Roble Classroom | Portable Rehab (DM) | Price Gillin | $54,866.00 | $- | $54,866.00 | 0% |
| 2006 | Casa Roble HS | Containment Curb Paving (DM) | Central Valley | $69,415.00 | $- | $69,415.00 | 0% |
| 2006 | El Camino | Landscape & Irrigation | Aerco Pacific | $137,719.00 | $822.00 | $138,541.00 | 1% |
| 2006 | Howe Ave | Paving (DM) | American Engineering | $198,000.00 | $10,301.00 | $208,301.00 | 5% |
| 2006 | Kenneth | Paving (DM) | Central Valley | $52,202.00 | $- | $52,202.00 | 0% |
| 2007 | Bella Vista / Sunrise | Seal Coat & Stripe | J&S Asphalt | $22,524.00 | $900.00 | $23,424.00 | 4% |
| 2007 | Casa Roble HS | Paving | Biondi Paving | $728,000.00 | $17,456.00 | $745,456.00 | 2% |
| 2007 | Louis Pasteur | Paving | Biondi Paving | $688,000.00 | $16,635.00 | $704,635.00 | 2% |
| 2007 | Laurel Ruff | Paving | AC General Engineering | $208,472.00 | $743.00 | $209,215.00 | 0% |
| 2007 | Mesa Verde HS | Paving | Martin General Engineering | $363,642.00 | $(5,008.00) | $358,634.00 | -1% |
| 2007 | Dyer Kelly ES | Paving | Martin Brothers Construction | $242,890.00 | $28,270.00 | $271,160.00 | 12% |
| 2007 | Encina HS | Paving | Central Valley | $755,820.00 | $28,091.00 | $783,911.00 | 4% |
| 2007 | Thomas Edison ES | Paving | Biondi Paving | $290,185.00 | $(464.00) | $289,721.00 | 0% |
| 2007 | Mira Loma | Painting (DM) | Horizon Painting | $233,397.00 | $- | $233,397.00 | 0% |
| 2007 | Whitney | Painting (DM) | Horizon Painting | $99,844.00 | $- | $99,844.00 | 0% |
| 2007 | El Camino | Landscape & Irrigation | Central Valley | $189,119.00 | $- | $189,119.00 | 0% |
| 2007 | Del Campo HS | Landscape & Irrigation | Biondi Paving | $79,900.00 | $2,603.00 | $82,503.00 | 3% |
| 2008 | Albert Schweitzer | Portable Rehab | Mascon Inc. | $1,878,400.00 | $(89,418.00) | $1,788,982.00 | -5% |
| 2008 | Gold River ES | Restrooms | LM Combs Construction | $102,800.00 | $8,440.00 | $111,240.00 | 8% |
| 2008 | Cowan ES | Landscape & Irrigation | Central Valley | $226,561.00 | $6,999.00 | $233,560.00 | 3% |
| 2008 | Deterding ES | Landscape & Irrigation | Central Valley | $289,361.00 | $(11,902.00) | $277,459.00 | -4% |
| 2008 | Barrett MS | Landscape & Irrigation | Jensen Corporation | $458,888.00 | $19,861.00 | $478,749.00 | 4% |
| 2008 | Cameron Ranch ES | Landscape & Irrigation | Jensen Corporation | $227,888.00 | $6,442.00 | $234,330.00 | 3% |
| 2008 | Coyle Avenue ES | Landscape & Irrigation | Central Valley | $108,610.00 | $5,159.00 | $113,769.00 | 5% |
| 2008 | Del Campo HS | Painting (DM) | Horizon Painting | $187,700.00 | $21,200.00 | $208,900.00 | 11% |
| 2008 | Andrew Carnegie MS | Painting (DM) | Golden California Painting | $92,120.00 | $- | $92,120.00 | 0% |
| 2008 | Palisades | Painting (DM) | Visions Painting | $58,600.00 | $(8,268.00) | $50,332.00 | -14% |
| 2008 | Del Paso Manor ES | Painting (DM) | Euro Style Management | $133,000.00 | $(4,600.00) | $128,400.00 | -3% |
| 2008 | Louis Pasteur | Beam Repair (DM) | Paul Kiz Construction | $130,000.00 | $4,800.00 | $134,800.00 | 4% |
| 2008 | Andrew Carnegie MS | Beam Repair (DM) | Paul Kiz Construction | $189,400.00 | $- | $189,400.00 | 0% |
| 2008 | Dewey Fundamental | Paving | James Riolo Paving | $350,000.00 | $65,526.00 | $415,526.00 | 19% |
| 2008 | Earl Legette ES | Paving | AC General Engineering | $243,118.00 | $17,414.00 | $260,532.00 | 7% |
| 2008 | Oakview ES | Paving | AC General Engineering | $102,052.00 | $6,952.00 | $109,004.00 | 7% |
| 2008 | Bella Vista HS | Paving | Teichert Construction | $351,887.00 | $60,537.00 | $412,424.00 | 17% |
| 2008 | Garfield ES | Paving | American Engineering | $320,451.00 | $10,427.00 | $330,878.00 | 3% |
| 2008 | Thomas Kelly | Paving | American Engineering | $107,564.00 | $8,571.00 | $116,135.00 | 8% |
| 2008 | Skycrest ES | Paving | Martin Brothers Construction | $424,864.00 | $11,729.00 | $436,593.00 | 3% |
| 2008 | Cambridge Heights | Paving | Martin Brothers Construction | $301,000.00 | $18,755.00 | $319,755.00 | 6% |
| 2008 | La Entrada | Paving | Central Valley | $245,000.00 | $(9,845.00) | $235,155.00 | -4% |
| 2008 | Coyle Avenue ES | Paving | Central Valley | $260,111.00 | $16,434.00 | $276,545.00 | 6% |
| 2008 | Rio Americano HS | Paving | Teichert Construction | $642,740.00 | $89,196.00 | $731,936.00 | 14% |
| 2008 | Andrew Carnegie MS | Paving | James Riolo Paving | $634,000.00 | $(5,637.00) | $628,363.00 | -1% |
| 2008 | Roberts ES | Paving & Storm Drain | American Engineering | $304,800.00 | $99.00 | $304,899.00 | 0% |
| 2008 | San Juan HS | Sewer Rehabilitation (DM) | American Engineering | $126,347.00 | $50,948.00 | $177,295.00 | 40% |
| 2008 | Ottomon ES | Fire Lane & Paving | American Engineering | $81,800.00 | $7,913.00 | $89,713.00 | 10% |
| 2008 | Coyle Avenue ES | Paving (DM) | Martin General Engineering | $173,000.00 | $(1,221.00) | $171,779.00 | -1% |
| 2008 | Bella Vista HS | Sewer Rehabilitation (DM) | JRS General Engineering / Trenchless | $47,981.00 | $- | $47,981.00 | 0% |
| 2008 | Casa Robles HS | Sewer Rehabilitation (DM) | AC General Engineering | $36,394.00 | $(7,500.00) | $28,894.00 | -21% |
| 2008 | Mesa Verde HS | New Gym | Clark & Sullivan | $3,217,764.00 | $(80,436.00) | $3,137,328.00 | -2% |
| 2009 | Del Campo HS | New Gym | Clark & Sullivan | $4,084,320.00 | $- | $4,084,320.00 | 0% |
| 2009 | Bella Vista HS | Septic System Abandonment (DM) | Sierra National Construction | $150,725.00 | $17,629.00 | $168,354.00 | 12% |
| 2009 | Arcade | Sewer Rehabilitation (DM) | Sierra National Construction | $75,643.00 | $(3,571.00) | $72,072.00 | -5% |
| 2009 | Louis Pasteur | New Portable Replacement | Peterson Developments | $613,500.00 | $5,598.00 | $619,098.00 | 1% |
| 2009 | Howe Ave | Portable (Site Drainage) | Martin General Engineering | $83,000.00 | $8,785.00 | $91,785.00 | 11% |
| 2009 | Louis Pasteur | Painting (DM) | Horizon Painting | $169,300.00 | $(67,566.00) | $101,734.00 | -40% |
| 2009 | Lichen ES | Painting (DM) | Horizon Painting | $132,600.00 | $(46,327.00) | $86,273.00 | -35% |
| 2009 | Barrett MS | Painting (DM) | Horizon Painting | $144,100.00 | $(39,681.00) | $104,419.00 | -28% |
| 2009 | Dewey Fundamental | Landscape & Irrigation | Parker Landscape Development | $58,029.00 | $(6,060.00) | $51,969.00 | -10% |
| 2009 | Thomas Kelly | Landscape & Irrigation | Parker Landscape Development | $112,144.00 | $(12,424.00) | $99,720.00 | -11% |
| 2009 | Starr King K-8 | Landscape & Irrigation | JRS General Engineering | $260,735.00 | $37,218.00 | $297,953.00 | 14% |
| 2009 | Garfield ES | Landscape & Irrigation | Parker Landscape Development | $86,395.00 | $(2,932.00) | $83,463.00 | -3% |
| 2009 | Roberts ES | Landscape & Irrigation | JRS General Engineering | $112,300.00 | $11,978.00 | $124,278.00 | 11% |
| 2009 | Mariemont ES | Paving | Western Engineering | $383,719.00 | $117,942.00 | $501,661.00 | 31% |
| 2009 | Del Dayo ES | Paving | B&B Asphalt | $385,869.00 | $19,045.00 | $404,914.00 | 5% |
| 2009 | Pershing | Paving | James Riolo Paving | $322,000.00 | $56,140.00 | $378,140.00 | 17% |
| 2009 | Gold River ES | Paving | Martin General Engineering | $30,000.00 | $- | $30,000.00 | 0% |
| 2009 | Citrus Heights | Paving | Western Engineering | $404,000.00 | $42,192.00 | $446,192.00 | 10% |
| 2009 | Green Oaks ES | Paving | Western Engineering | $191,000.00 | $7,910.00 | $198,910.00 | 4% |
| 2009 | Sealcoat & Stripe 2009 (MJ) | Striping | J&S Asphalt | $73,082.00 | $1,170.00 | $74,252.00 | 2% |
| 2009 | Sealcoat & Stripe 2009 (DM) | Striping | J&S Asphalt | $135,581.00 | $10,538.00 | $146,119.00 | 8% |
| 2009 | Encina HS | Large Gym Floor (DM) | Borberg Hardwood Floors | $64,495.00 | $9,450.00 | $73,945.00 | 15% |
| 2010 | Andrew Carnegie MS | New Classroom Wing & Weight Room | Bobo Construction | $1,560,000.00 | $10,698.00 | $1,570,698.00 | 1% |
| 2010 | Barrett MS | Classroom Improvements | Kiz Construction | $56,000.00 | $- | $56,000.00 | 0% |
| 2010 | Will Rogers MS | INC 1 Sitework | Martin General Engineering | $1,198,000.00 | $6,059.00 | $1,204,059.00 | 1% |
| 2010 | Arden MS | Paving | Sierra Asphalt | $764,385.00 | $28,871.00 | $793,256.00 | 4% |
| 2010 | Arlington Heights ES | Paving | Parker Landscape Development | $370,580.00 | $23,206.00 | $393,786.00 | 6% |
| 2010 | Carmichael ES | Paving | B&B Asphalt | $837,000.00 | $79,041.00 | $916,041.00 | 9% |
| 2010 | Greer ES | Paving | Parker Landscape Development | $704,000.00 | $100,670.00 | $804,670.00 | 14% |
| 2010 | Whitney Ave. ES | Paving | Biondi Paving | $653,000.00 | $60,815.00 | $713,815.00 | 9% |
| 2010 | Woodside ES | Paving | Western Engineering | $373,000.00 | $34,854.00 | $407,854.00 | 9% |
| 2010 | Bella Vista HS | Landscape & Irrigation | Parker Landscape Development | $141,000.00 | $1,200.00 | $142,200.00 | 1% |
| 2010 | Mission Ave. ES | Landscape & Irrigation | Aerco Pacific | $54,782.00 | $766.00 | $55,548.00 | 1% |
| 2011 | Will Rogers MS | Inc 2 Building New Weight Room | Lamon Construction | $589,000.00 | $8,123.00 | $597,123.00 | 1.38% |
| 2011 | Coyle Avenue ES | Portables | Carter-Kelly Inc. | $1,309,407.00 | $(15,432.00) | $1,293,975.00 | -1.18% |
| 2011 | Sierra Oaks ES | New Classroom Wing | Landmark Construction | $1,234,000.00 | $(11,981.00) | $1,222,019.00 | -0.97% |
| 2011 | Arden MS / Del Paso Manor ES | Portables | Lamon Construction | $418,000.00 | $(12,006.00) | $405,994.00 | -2.87% |
| 2011 | Mission Ave. ES | Portable Relocation | Owens Construction | $73,535.00 | $2,712.00 | $76,247.00 | 3.69% |
| 2011 | Little John ES | Paving | Brownsville Sand & Gravel | $195,000.00 | $(4,884.00) | $190,116.00 | -2.50% |
| 2011 | Cottage ES | Paving | Lamon Construction | $739,000.00 | $(778.00) | $738,222.00 | -0.11% |
| 2011 | Palisades | Paving | Martin General Engineering | $282,000.00 | $32,656.00 | $314,656.00 | 11.58% |
| 2011 | Seal & Strip 2010 | Striping | Dryco | $63,785.00 | $- | $63,785.00 | 0.00% |
| 2011 | Dyer Kelly | Landscape & Irrigation | Saenz Landscape | $594,283.00 | $29,923.00 | $624,206.00 | 5.04% |
| 2011 | Del Paso Manor ES | Landscape & Irrigation | Martin General Engineering | $869,000.00 | $22,729.00 | $891,729.00 | 2.62% |
| 2011 | Edison ES | Landscape & Irrigation | Martin General Engineering | $252,000.00 | $2,118.00 | $254,118.00 | 0.84% |
| 2011 | Jonas Salk MS | Landscape & Irrigation | Biondi Paving | $126,850.00 | $16,184.00 | $143,034.00 | 12.76% |
| 2011 | Whitney Ave. ES | Landscape & Irrigation | Saenz Landscape | $38,071.00 | $2,016.00 | $40,087.00 | 5.30% |
| 2011 | Bella Vista HS | Track Resurfacing | California Track and Engineering | $219,400.00 | $- | $219,400.00 | 0.00% |
| 2011 | Mira Loma HS | Restrooms | Melnikov | $473,000.00 | $8,848.00 | $481,848.00 | 1.87% |
| 2011 | Churchill ES | Restrooms | Star Construction | $359,000.00 | $- | $359,000.00 | 0.00% |
| 2011 | Deterding ES | Restrooms | Owens Construction | $261,270.00 | $7,837.00 | $269,107.00 | 3.00% |
| 2011 | Greer ES | Restrooms | Euro Style Management | $174,800.00 | $ 993.00 | $175,793.00 | 0.57% |
| 2011 | Food Services | Roofing (DM) | Peterson Developments | $40,500.00 | $- | $40,500.00 | 0.00% |
| 2011 | Mira Loma HS | Gym Floor (DM) | Boberg Hardwood Floors | $126,295.00 | $(10,000.00) | $116,295.00 | -7.92% |
| 2011 | Garfield ES | Roof Canopy (DM) | Owens Construction | $90,650.00 | $- | $90,650.00 | 0.00% |
| 2011 | Del Campo HS | W.I. Fence (DM) | Land Graphics | $96,850.00 | $5,675.00 | $102,525.00 | 5.86% |
| 2011 | Arden MS | Bike Rack (DM) | Martin General Engineering | $20,800.00 | $- | $20,800.00 | 0.00% |